Tenet provided the Front End Engineering Design (FEED) Services as part of a £30M upgrade of a Brewery complex in Ethiopia.
Case Studies
We only work in solutions
Scada replacement project
As part of a Supervisory Control And Data Acquisition (SCADA) replacement project it was recognised that the physical migration from the existing control system to the new system would require significant care and management.
Interim Police Control Centre (IPCC)
In order to provide resilience for the Sellafield site the Civil Nuclear Constabulary (CNC) require availability of a minimum of two fully operational and fully redundant security control rooms.
3D Precision Structural Sensing system
As structures reach (and eventually exceed) their design life it is often necessary to introduce enhanced monitoring to demonstrate that the structure remains well within safe tolerances.
Tram Network
Detailed design and construction support for trackside services for a trail of a new tram network in a major UK city.
Safety substantiation - LTPR
The client was required, as part of the Magnox Swarf Storage Silo (MSSS) Long Term Periodic Review (LTPR) task, to undertake assessments of the current safety requirements of the plant in order to substantiate that the Safety Systems and Components (SSC) will deliver their required Safety Functions.
Island Sites 2A – Security Project
Tenet was engaged, via Atkins, to provide the detail design works associated with a client’s Security Enhancement Programme. These works sought to increase security arrangements around certain specific areas of the site and provide added resilience to services interruption. The work needed to be undertaken without impacting on the routine site operations.
E23 Additional nitrogen supply
Historically, a single bulk nitrogen tank supplied the centrifuge enrichment plant on the Capenhurst site with its requirements for gaseous and liquid nitrogen.
Fire Alarm System Design
A major UK client decided, in the wake of Grenfell tower, that they required all replacement and new fire alarm systems to be designed by a third party accredited designers.
URENCO As-Built
As part of the Capenhurst site refurbishment and upgrade program the client required an assessment of all EC&I systems across all production facilities in buildings E23, E22 and A3.